Project Description

Marine Engineering Retrofits and Modifications

Engineering: SLNC Pax Mooring Winch Modifications

HEC prepared the foundation design for new mooring winches for the tanker Schuyler Line Navigation Company (SLNC) PAX. (2019-2020)