Project Description

Marine Engineering Retrofits and Modifications

Engineering: SeaBulk Challenge IG System Replacement

HEC supported Fairwater Tankers in replacing major parts of the inert gas generator system on the vessel: SEABULK CHALLENGE. HEC developed the equipment replacement and reuse plan, design engineering, regulatory approval, including necessary piping diagrams, installation arrangements, and electrical connection diagrams. (2023-2024)